Saturday, December 25, 2010

Charlemagne King Of Hearts

temporal reality constructed reality

Final Delivery Tuesday January 18

goal

The latest installment of the course will be based on consolidating and accurately convey all the work contained therein, to reach the global construction, give precise answers to each and every one of the aspects listed in documentation, please Carefully read the contents to be asked.

Delivery is pricked at 15.30 pm, occupying all the room 2.4. (Corks, windows, etc. ..), placing the tables in the center of the classroom and enabling wider aisles for sesióncrítca development in the central tables will be located models of each proposal.


content

Prick the top of the class the following documents:

1 / Documents introduce and summarize the actions that have led the main priorities of the project, simplifying the communication process.

These documents deal with dynamic A-1.

2 / Plant Development , Sections, Elevations and Images (models and assemblies), worked to scale between 1 / 200 to 1 / 50 these documents argue the following aspects of the project:

- structural-constructive system-energy-topographical.
- specific program, implications to the topography and rainfall conditions.
- Terms Sustainability and Efficiency in all contexts.
- Proyectual Landscape - Cultural Landscape.
- Memory - Manifesto (max. 30 words).

These documents deal with dynamic FOUR-1.

3 / constructive COMPLETE Sections (one vertical and one horizontal) to 1 / 20 scale that help to specify, and build:

- ; operating systems in the project (construction and technical-weather, ...)
- Materiality and environmental conditions (legends specific)

These documents will occupy two dynamic-1

4 / Axonometric Section Deployed horizontally and vertically to deepen the construction methods and energy systems of the proposal.

These documents will occupy a dynamic-1.

5 / DOS Summary pane of the proposal, to synthesize and demonstrate the final results obtained are presented at DINA-1 VERTICAL format on 5 mm foam board.
also be given:

- dynamic TEN-4 and reductions in the Dina-1.
- CD-Rom with the ten panels in PDF format
- ; panels were hung on the blog before Wednesday January 19 for evaluation.



final delivery of the course and therefore qualifying for the approved course is deemed complete when all documents have been delivered in the minimum required time and date scheduled January 18 15.30

0 comments:

Post a Comment